WATER SYSTEM UPGRADES and IMPROVEMENTS
FALL/2016 – Replaced water main in alley behind South Main St. from the Admiral Trost Dr. to intersection with South 3rd St.
MAR/2017 – Replaced and permitted all four chemical feed pumps located in Water Plant (phosphate, hydrofluorosilicic acid,
polymer, potassium permanganate)
MAR/2017 – Installed new Flow Meter in Water Plant
APR/2017 – Regenerated Well #1 and repaired/refurbished pump
MAY/2017 – 600,000 gallon tank located in quarry was sandblasted/repaired/painted. Reconfigured plumbing in valve pit.
SEPT/2017 – Replaced Water Main in alley between 2nd St. & 3rd St. at Lindemann (from bank building to police department).
SEPT/2017 – Diver cleaned and inspected Derton Water Tank. Follow-up inspection performed Jan/2018
SEPT/2017 – Flushed and inspected Apple Blossom Water Tank
DEC/2017 – Installed new Water Main on South 2nd St. from North Main St. to Kroeger Ave.
MAR/2018 – Regenerated Well #2 and repaired/refurbished pump
PROJECTS PLANNED for SPRING-SUMMER/2018
Replace media, sand, and filter nozzles in all three filters in Water Plant.
Install new Water Main on Louisa from Main St. to Admiral Trost Dr.